Cuttings re-injection promises to put drilled waste safely back into the formation — but there’s a difference between waste that is truly contained in a fracture and waste that is simply being pumped down a hole. This video is about knowing which one you actually have.
What this video covers
- What containment actually means in a CRI operation
- The difference between a contained fracture and just pumping away
- Why injection pressure alone doesn’t prove containment
- What to monitor to know the waste is staying where you put it
- Why a failed CRI is a problem you find out about too late
Watch on our channel ↗