The method, in the open
The formulas, target bands and definitions behind every SC DrillTech recommendation — open for any engineer to use. No sign-up required.
Core solids-control formulas
Engineering relationships and field guide bands, with units stated below. Verify operating targets against OEM duty and site procedure; these are not universal API limits.
| Quantity | Formula | Target / band |
|---|---|---|
| Shaker / centrifuge G-force | G = N² · s ÷ 70,414 | N in rpm; s = full shaker stroke or bowl diameter, inches. Verify OEM duty. |
| Agitator turnover (TOR) | TOR = (V ÷ Q) · 60 | V in gal; Q in gal/min; result in seconds. 40–85 s is a field guide, not proof of suspension. |
| Hydrocyclone feed head | h = 19.2 · p ÷ ρ | p in psi; ρ in ppg; h in ft of pumped mud. Use OEM cone head. |
| Line velocity | v = 0.4085 · Q ÷ d² | Q in gal/min; internal d in inches; v in ft/s. Check service and erosion limits. |
| Solids removal efficiency (SRE) | SRE = 100 · Vremoved ÷ Vhole | Drilled-solids volume removed / excavated hole volume, same interval and units; interpret with MCR. |
| Two-component solids mass fraction | wₐ = 100·w₃(w₁−w₂)/[w₁(w₃−w₂)] | w₁ = mixture, w₂ = liquid, w₃ = solids density, same units; not equipment recovery. |
More to explore
Glossary & nomenclature
Every symbol and unit used across solids control, mud and DWM — defined in plain language.
API RP 13C notes
Field notes on processing-system evaluation and screen designation; the Sixth Edition uses SRE and MCR alongside dilution and waste-volume analysis.
Calculator cheat-sheets
One-page references for the most-used calculations — the lite version of the tool kits.
Field FAQ
Common solids-control and waste questions, answered from rig experience.
Environmental & compliance
EPA, OSPAR & ROPME discharge limits and zero-discharge — explained for the field.