By Othman Soliman — Solids Control & Drilling-Waste specialist, 26+ yrs (GCC & MENA). Last reviewed .
Free fill-in shaker audit: per-panel API numbers and condition, coverage and flooding, the G-force calculation line, deck angle, bypass status and a pass/fail verdict.
What's inside the PDF
Panel-by-panel table: API number (RP 13C), hours, condition
Machine checks with the G-force line: stroke × RPM² ÷ 70,400
The pass criteria that make the audit defensible
Designed for A4 printing — fill it in at the unit or in the mud lab.
Get the PDF — free
Enter your work email and the download opens instantly.